* See in the architectural drafting book for reference.
Former student drawing sets are available for reference as well as library resources.
Billings City Codes will need to be reviewed for compliance.

Use Floor and Basement Plans - (Do NOT use a copy! Do NOT remove existing information!)
Door Schedule:
Place Numbered circle at each door.Create a door schedule chart with the following information:
| Symbol | Quantity | Type | Rough Opening | Door Size | Thickness | Material |
Manufacturer Name & Number |
Location | Remarks |
| *Hyperlink | |||||||||
Window Schedule:
Place a Lettered hexagon at each window.Create a window schedule chart with the following information:
| Symbol | Quantity | Type | Rough Opening | Sash/Unit Size | Manufacturer Name & Number | Location | Remarks |
| *Hyperlink | |||||||
Header Schedule: (Refer back to Chapter 14)
Use Floor and Roof framing plan. (Do NOT use a copy! Do NOT remove existing information!)
Show Headers over all openings (ie, doors, windows, arches, closet openings, etc,.) -
Use a single centerline with a Thick (.6mm) pen thickness -
Label each header with a H# .
Create a header schedule with the following information:
| Header label | Quantity | Size | Material used | Remarks (locations) |