* See Chapter 15 in the architectural drafting book for reference.

Former student drawing sets are available for reference as well as library resources.

Billings City Codes will need to be reviewed for compliance.

door-window-bak.gif (20836 bytes)

Use Floor and Basement Plans - (Do NOT use a copy!  Do NOT  remove existing information!)

Door Schedule:

Place Numbered circle at each door.

Create a door schedule chart with the following information:

Symbol Quantity Type Rough Opening Door Size Thickness Material Manufacturer
Name & Number
Location Remarks
                  *Hyperlink    
                   

 

Window Schedule:

Place a Lettered hexagon at each window.

Create a window schedule chart with the following information:

Symbol Quantity Type Rough Opening  Sash/Unit Size Manufacturer Name & Number Location Remarks
                         *Hyperlink    
               

     

Header Schedule: (Refer back to Chapter 14)

Use Floor and Roof framing plan. (Do NOT use a copy!  Do NOT  remove existing information!)

Show Headers over all openings (ie, doors, windows, arches, closet openings, etc,.) -

                Use a single centerline with a Thick (.6mm) pen thickness -

                Label each header with a H# .

Create a header schedule with the following information:

Header label Quantity Size Material used  Remarks (locations)
         
         

Construction "TIP-O-THE-DAY" -

DO NOT USE STANDARD TEXT

FOR ANYTHING, ANYWHERE, ANYTIME....